PROJECTS REFERENCES

IPEC (Ideh-Pouyan Energy Co.) is a private company, specialized in engineering and services of different types of pipelines. According to the team’s high level of expertise in both onshore and offshore pipelines, IPEC is always interested to carry out projects that challenge the engineering society of oil and gas industry. Our capability spans all types of pipeline services such as basic design, detailed design and precommissioning.

DOWNLOAD ALL PROJECTS

1 Masjed Soleiman Petrochemical Plant - Assembly and Mooring of Floating Water Pumping Station

Project Title: Masjed Soleiman Petrochemical Plant - Assembly and Mooring of Floating Water Pumping Station

Company: PEC / MIS

Location: Masjed Soleiman - Iran

Year: 2020

Status: On going...

Description:

Assembly and Mooring of Walkway

Construction of Anchor Blocks

Transition and Mooring of Barge

2 SP Phase 16 & 19 - Offshore Pipeline Inline Inspection

Project Title: SP Phase 16 & 19 - Offshore Pipeline Inline Inspection

Company: ZOGPI / POGC

Location: Assalouyeh - Iran

Year: 2020

Status: On going...

Description:

Flooding/Flushing, Dewatering, Swabbing, N2 Purging, Commissioning, Inline Inspection, Degassing

  • 1 Pipeline(s) | 32 in | 113.5 km 
  • 1 Pipeline(s) | 32 in | 120 km 

3 Masjed Soleiman Petrochemical Plant - Water Pumping Services

Project Title: Masjed Soleiman Petrochemical Plant - Water Pumping Services

Company: PEC / MIS

Location: Masjed Soleiman - Iran

Year: 2020

Status: On going...

Description:

Flooding/Flushing, Equipment Rental

  • 1 Pipeline(s) | 28 in | 11 km 
  • 1 Pipeline(s) | 24 in | 0.5 km 

4 Bid Boland 2 - Onshore Pipeline Commissioning

Project Title: Bid Boland 2 - Onshore Pipeline Commissioning

Company: PGBGTP

Location: Behbahan - Iran

Year: 2020

Status: On going...

Description:

Dewatering, Swabbing, N2 Purging, Commissioning

  • 1 Pipeline(s) | 42 in | 27.2 km 
  • 1 Pipeline(s) | 36 in | 46.5 km 
  • 1 Pipeline(s) | 20 in | 105.8 km 
  • 1 Pipeline(s) | 10 in | 106.2 km 
  • 2 Pipeline(s) | 8 in | 106.2 km 

5 Manjil / Roodbar Construction - Suction Pumps Rental

Project Title: Manjil / Roodbar Construction - Suction Pumps Rental

Company: Otaredian Co.

Location: Manjil - Iran

Year: 2020

Status: Completed

Description:

Equipment Rental

6 Bid Boland 1 - Onshore Pipeline Commissioning

Project Title: Bid Boland 1 - Onshore Pipeline Commissioning

Company: PGBGTP

Location: Behbahan - Iran

Year: 2019

Status: Completed

Description:

Swabbing, N2 Purging, Commissioning

  • 1 Pipeline(s) | 48 in | 13.8 km 
  • 1 Pipeline(s) | 24 in | 71.4 km 
  • 1 Pipeline(s) | 16 in | 30.3 km 

7 SP Phase 13 - Onshore Pipeline Isolation for ESDV Installation

Project Title: SP Phase 13 - Onshore Pipeline Isolation for ESDV Installation

Company: Omran Sanat / SADRA

Location: Kangan - Iran

Year: 2019

Status: Completed

Description:

Isolation, Degassing

  • 1 Pipeline(s) | 32 in | 0.9 km 

8 SP Phase 13 - Onshore Pipeline Pre-commissioning

Project Title: SP Phase 13 - Onshore Pipeline Pre-commissioning

Company: Omran Sanat / SADRA

Location: Kangan - Iran

Year: 2018

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 2 Pipeline(s) | 32 in | 0.9 km 
  • 1 Pipeline(s) | 4 in | 0.9 km 

9 SP Phase 19C - Offshore Pipeline Pre-commissioning during Repair

Project Title: SP Phase 19C - Offshore Pipeline Pre-commissioning during Repair

Company: IOEC

Location: Persian Gulf - Iran

Year: 2018

Status: Completed

Description:

Flooding/Flushing, Dewatering, Swabbing, N2 Purging

  • 1 Pipeline(s) | 32 in | 113.5 km 

10 SP Phase 19C - Offshore Pipeline Pre-commissioning during Repair

Project Title: SP Phase 19C - Offshore Pipeline Pre-commissioning during Repair

Company: IOEC

Location: Persian Gulf - Iran

Year: 2018

Status: Completed

Description:

Flooding/Flushing, Dewatering, Offshore Activities

  • 1 Pipeline(s) | 32 in | 5 km 
  • 1 Pipeline(s) | 18 in | 5 km 

11 SP Phase 19 - Offshore Pipeline Isolation and Degassing

Project Title: SP Phase 19 - Offshore Pipeline Isolation and Degassing

Company: IOEC

Location: Persian Gulf - Iran

Year: 2017

Status: Completed

Description:

Isolation, Degassing

  • 1 Pipeline(s) | 32 in | 5 km 
  • 1 Pipeline(s) | 18 in | 5 km 

12 SP Phase 19 - Offshore Pipeline Pre-commissioning

Project Title: SP Phase 19 - Offshore Pipeline Pre-commissioning

Company: IOEC

Location: Persian Gulf - Iran

Year: 2017

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 1 Pipeline(s) | 4 in | 110 km 

13 SP Phase 17 - Offshore Infield Pipeline Pre-commissioning

Project Title: SP Phase 17 - Offshore Infield Pipeline Pre-commissioning

Company: Ral Offshore

Location: Persian Gulf - Iran

Year: 2017

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 1 Pipeline(s) | 20 in | 20 km 
  • 1 Pipeline(s) | 4 in | 20 km 

14 SP Phase 18 - Offshore Infield Pipeline Pre-commissioning

Project Title: SP Phase 18 - Offshore Infield Pipeline Pre-commissioning

Company: SGK

Location: Persian Gulf - Iran

Year: 2016

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 1 Pipeline(s) | 18 in | 9 km 
  • 1 Pipeline(s) | 4 in | 9 km 

15 SP Phase 22 - Offshore Pipeline Pre-commissioning

Project Title: SP Phase 22 - Offshore Pipeline Pre-commissioning

Company: Ral Offshore / IOEC

Location: Persian Gulf - Iran

Year: 2016

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 1 Pipeline(s) | 32 in | 109 km 
  • 1 Pipeline(s) | 4 in | 109 km 

16 SP Phase 19 - Offshore Pipeline Pre-commissioning

Project Title: SP Phase 19 - Offshore Pipeline Pre-commissioning

Company: Ral Offshore / IOEC

Location: Persian Gulf - Iran

Year: 2015

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 2 Pipeline(s) | 32 in | 110 km 
  • 1 Pipeline(s) | 4 in | 110 km 

17 SP Phase 12 - SPM Swivel Hydrostatic Testing

Project Title: SP Phase 12 - SPM Swivel Hydrostatic Testing

Company: IOEC / POGC

Location: Persian Gulf - Iran

Year: 2015

Status: Completed

Description:

Hydrotest

18 SP Phase 15 & 16 - Offshore Pipeline Pre-commissioning

Project Title: SP Phase 15 & 16 - Offshore Pipeline Pre-commissioning

Company: SKG / IOEC

Location: Persian Gulf - Iran

Year: 2015

Status: Completed

Description:

Dewatering

  • 1 Pipeline(s) | 4 in | 120 km 

Flooding/Flushing

  • 1 Pipeline(s) | 4 in | 120 km 

19 SP Phase 17 & 18 - Offshore Pipeline Pre-commissioning

Project Title: SP Phase 17 & 18 - Offshore Pipeline Pre-commissioning

Company: IOEC / POGC

Location: Persian Gulf - Iran

Year: 2014

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 2 Pipeline(s) | 32 in | 103 km 
  • 2 Pipeline(s) | 4 in | 103 km 

20 SP Phase 19 - Onshore Pipeline Pre-commissioning

Project Title: SP Phase 19 - Onshore Pipeline Pre-commissioning

Company: Maroon Karan / IOEC

Location: Assalouyeh - Iran

Year: 2014

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying

  • 2 Pipeline(s) | 32 in | 1.5 km 
  • 2 Pipeline(s) | 4 in | 1.5 km 

21 SP Phase 17 & 18 - Onshore Pipeline Pre-commissioning

Project Title: SP Phase 17 & 18 - Onshore Pipeline Pre-commissioning

Company: IOEC / POGC

Location: Assalouyeh - Iran

Year: 2014

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Hydrotest, Dewatering, Swabbing, Drying, N2 Purging

  • 2 Pipeline(s) | 32 in | 4.8 km 
  • 2 Pipeline(s) | 4 in | 4.8 km 

22 SP Phase 12 - Offshore Pipeline Pre-commissioning

Project Title: SP Phase 12 - Offshore Pipeline Pre-commissioning

Company: IOEC / POGC

Location: Persian Gulf - Iran

Year: 2014

Status: Completed

Description:

Flooding/Flushing, Hydrotest

  • 1 Pipeline(s) | 30 in | 4.5 km 
  • 1 Pipeline(s) | 4 in | 4.5 km 

23 New Hengam - Offshore Pipeline Engineering

Project Title: New Hengam - Offshore Pipeline Engineering

Company: Ocean US / IOOC

Location: Persian Gulf - Iran

Year: 2014

Status: Completed

Description:

Engineering

  • 2 Pipeline(s) | 14 in | 3 km 
  • 2 Pipeline(s) | 4 in | 3 km 

24 Reshadat Infield - Offshore Pipeline Pre-commissioning

Project Title: Reshadat Infield - Offshore Pipeline Pre-commissioning

Company: TASDID / IOOC

Location: Persian Gulf - Iran

Year: 2014

Status: Completed

Description:

Dewatering, Drying, N2 Purging

  • 1 Pipeline(s) | 16 in | 5.3 km 
  • 1 Pipeline(s) | 10 in | 56 km 
  • 1 Pipeline(s) | 10 in | 5.45 km 
  • 1 Pipeline(s) | 8 in | 5.2 km 

25 Mubarak & Salman Infield - Offshore Pipeline Leak Test and Purging

Project Title: Mubarak & Salman Infield - Offshore Pipeline Leak Test and Purging

Company: Ocean US / IOEC

Location: Persian Gulf - Iran

Year: 2013

Status: Completed

Description:

N2 Purging, Leak Test

  • 1 Pipeline(s) | 4 in | 3.1 km 
  • 1 Pipeline(s) | 4 in | 2 km 
  • 1 Pipeline(s) | 4 in | 0.6 km 
  • 1 Pipeline(s) | 4 in | 2.3 km 
  • 1 Pipeline(s) | 4 in | 3 km 
  • 1 Pipeline(s) | 4 in | 1.4 km 
  • 1 Pipeline(s) | 4 in | 3.4 km 
  • 1 Pipeline(s) | 4 in | 3.6 km 
  • 1 Pipeline(s) | 4 in | 3.9 km 
  • 1 Pipeline(s) | 4 in | 3 km 
  • 1 Pipeline(s) | 14 in | 2.9 km 
  • 1 Pipeline(s) | 20 in | 3.4 km 
  • 1 Pipeline(s) | 20 in | 5.3 km 
  • 1 Pipeline(s) | 6 in | 0.2 km 
  • 2 Pipeline(s) | 30 in | 0.1 km 

26 SP Phase 13 - Detailed Engineering

Project Title: SP Phase 13 - Detailed Engineering

Company: SADRA

Location: Persian Gulf - Iranian

Year: 2012

Status: Completed

Description:

Engineering

  • 1 Pipeline(s) | 32 in 
  • 1 Pipeline(s) | 18 in  
  • 1 Pipeline(s) | 4 in  

27 Dorood Oil Field - Detailed Engineering

Project Title: Dorood Oil Field - Detailed Engineering

Company: Saff Rosemond

Location: Persian Gulf - Iran

Year: 2012

Status: Completed

Description:

Engineering

  • 1 Pipeline(s) | 10 in 
  • 1 Pipeline(s) | 8 in  
  • 6 Pipeline(s) | 6 in  

28 SP Phase 1 - Offshore Pipeline Pre-commissioning

Project Title: SP Phase 1 - Offshore Pipeline Pre-commissioning

Company: Ral Offshore

Location: Persian Gulf - Iran

Year: 2011

Status: Completed

Description:

Hydrotest

  • 1 Pipeline(s) | 18 in | 5 km 

29 Hendijan Oil Field - Offshore Pipeline Pre-commissioning

Project Title: Hendijan Oil Field - Offshore Pipeline Pre-commissioning

Company: Atlas Offshore Co.

Location: Persian Gulf - Iran

Year: 2011

Status: Completed

Description:

Hydrotest

  • 2 Pipeline(s) | 12 in | 6 km 

30 Sirri - Assalouyeh - Onshore Pipeline Pre-commissioning

Project Title: Sirri - Assalouyeh - Onshore Pipeline Pre-commissioning

Company: IGC

Location: Assalouyeh & Sirri Island - Iran

Year: 2011

Status: Completed

Description:

Dewatering, Drying, N2 Purging

  • 1 Pipeline(s) | 32 in | 13 km

31 Sirri - Assalouyeh - Offshore Pipeline Pre-commissioning

Project Title: Sirri - Assalouyeh - Offshore Pipeline Pre-commissioning

Company: IOEC

Location: Assalouyeh - Iran

Year: 2011

Status: Completed

Description:

Flooding/Flushing, Cleaning, Gauging, Dewatering, Swabbing, Drying, N2 Purging, Inline Inspection

  • 1 Pipeline(s) | 32 in | 289 km 

32 Sirri - Assalouyeh - Offshore Pipeline Pre-commissioning

Project Title: Sirri - Assalouyeh - Offshore Pipeline Pre-commissioning

Company: IOEC

Location: Assalouyeh - Iran

Year: 2010

Status: Completed

Description:

Dewatering, Drying

  • 1 Pipeline(s) | 32 in | 289 km 

33 Gachsaran Des. Plant - Gas Ejector Procurement

Project Title: Gachsaran Des. Plant - Gas Ejector Procurement

Company: Behin Energy Afagh / NISOC

Location: Ahwaz - Iran

Year: 2010

Status: Completed

Description:

Procurement