IPEC | Project Reference
(+9821) 88768818

Project Gallery

Projects Reference

Reshadat Oil Field Offshore Pipelines

Company: Tasdid
Year: 2014
Status: Completed
Description:

• Dewatering
• Drying
• Nitrogen Purging

 

South Pars Phase 15 & 16, Offshore Pipeline Pre Commissioning Project

Company: SGK / IOES
Year: 2014
Status: Completed
Description:

- (1 lines × 120 km × 32")
• Dewatering
- (1 lines × 120 km × 4")
• Flooding

South Pars Phase 17 & 18, Onshore Pipeline Pre Commissioning Project

Company: IOEC
Year: 2014
Status: Completed
Description:

- (2 lines × 4.5 km × 32")
- (2 lines × 4.5 km × 4")
• FCG & Hydrotest
• Dewatering
& Drying
• Nitrogen Purging

South Pars Phase 19, Onshore Pipeline Pre Commissioning Project

Company: Maroon Karan / IOEC
Year: 2014
Status: Completed
Description:

- (2 lines × 1.5 km × 32")
- (2 lines × 1.5 km × 4")
• FCG & Hydrotest
• Dewatering & Drying

 

 

Mubarak/Salman Field Offshore Pipelines Leak Test/Purging Project

Company: Ocean US (IOOC)
Year: 2013
Status: Completed
Description:

- ( 200 m, 30”, 100 bar)
- (200 m, 6”, 167 bar)

- (26.3 km, 4”, 167 bar)
- (2.9 km, 14”, 14 bar)
- (8.7 km, 20”, 104 bar)

  • Leak Test
  • N2 purging

Challenges : Completed without any challenge

Solutions: -

South Pars Phase 17 & 18, Offshore Pipeline Pre commissioning Project

Company: IOEC
Year: 2013
Status: In Progress
Description:

- (2 lines × 120 km × 32")
- (2 lines × 120 km × 4")

• FCG & Hydro test
• Dewatering & Drying
• N2 Purging

Challenges : Completed without any challenge

Solutions : -

New Hengam Offshore Pipeline Engineering Project

Company: Ocean US
Year: 2013
Status: Completed
Description:

- (2 line × 3 km × 14")
- (2 line × 3 km × 4.5")

South Pars Phase 19, Offshore Pipeline Pre Commissioning Project

Company: IOEC
Year: 2013
Status: In Progress
Description:

- (2 lines × 110 km × 32")
- (2 lines × 110 km × 4")
• FCG & Hydrotest
• Dewatering & Drying
• N2 Purging

Dorood D22 Wellhead Offshore Pipeline Engineering Project

Company: Saff Rosemond
Year: 2012
Status: In progress
Description:

Challenges 

  • Design Pressure

Solutions

  • According to Hibbs design, wall thickness reduced.

Siri – Assalouyeh Onshore Pipeline Pre commissioning Project

Company: IOEC
Year: 2011
Status: Completed
Description:

- (1 line × 13 km × 32")
• Dewatering

• N2 Purging

Challenges

  • Sour Gas Pipeline
  • Dew Point -20 °c"

Solutions

  • Using Blower 18000 m3/h
  • Using Drying Unit 18000 m3/h
  • Using Nitrogen Poducer Unit, Nitrogen Generator 2000 m3/h

Siri – Assalouyeh Offshore Pipeline Pre commissioning and Inspection Project

Company: IOEC
Year: 2011
Status: Completed
Description:

- (1 line × 300 km × 32")
• Cleaning

• Inline Inspection
• N2 Purging

Challenges

  • 300 Km Pipeline (longest subsea pipeline in middle-east)
  • The Pipeline Was Not Enough Cleaned for Inspection
  • Pre-Inspection Required
  • Client Changed Equipment (MFL to UT Intelligent Pig)
  • High Volume of N2 Required for Nitrogen Purging

Solutions

  • The Cleaning Was Performed 3 times
  • Totally 47 pigs were run including foam pigs,polly pigs, brush pigs and Bi-Di pigs.
  • Pre-Inspection Was Performed by Caliper Tool
  • Providing Special Camera Pig By IPEC for Inline Visual Inspection
  • Providing Ultra-Sonic Inspection Tools Instead of MFL from NDT Company Germany
  • Using Nitrogen Producer Unit, Nitrogen Generator 2000 m3/h

South Pars Phase 1, Infield Pipeline Pre commissioning Project

Company: Rall Offshore
Year: 2011
Status: Completed
Description:

- (1 line × 5km × 18")
• Hydro test

Challenges

  • Extreme weather during operation

Solutions

  • Using special equipment for pipeline testing

Hendijan Oil Field, Pipeline Pre commissioning Project

Company: Atlas Offshore
Year: 2011
Status: Completed
Description:

- (2 lines × 6 km × 12")
• Hydro test

Challenges : Completed without any challenge

Solutions : -

South Pars Phase 13, Offshore Pipeline Detail Design Verification in Collaboration with Deep Sea Co. (UK)

Company: Sadra
Year: 2011
Status: Completed
Description:

Challenges : Completed without any challenge

Solutions : -

Siri – Assalouyeh Offshore Pipeline Pre commissioning Project

Company: IOEC
Year: 2010
Status: Completed
Description:

- (1 line × 300 km × 32")
• Dewatering
• Drying

Challenges

  • Sour Gas Pipeline
  • 300 Km Pipeline (longest subsea pipeline in middle-east)
  • Dew Point -20 °c
  • Water Supply
  • The pipeline is not clean enough to send ultra-sonic pig in the line

Solutions

  • Using Blower 18000 m3/h
  • Using Drying Unit 18000 m3/h
  • Long term contract with biggest fresh water supplier of Assalouyeh
  • Performing pre inspection two times before using UT

Equipment supply for desulting plant of gachsaran

Company: Behin Energy Afagh Co. / NISOC
Year: 2010
Status: Completed
Description:

Challenges :

  • High Technology Product
  • Short time for delivery

Solutions :

  • Approaching to a Reputable Korean Manufacturer
  • Air Freight