PROJECTS REFERENCES

IPEC (Ideh-Pouyan Energy Co.) is a private company, specialized in engineering and services of different types of pipelines. According to the team’s high level of expertise in both onshore and offshore pipelines, IPEC is always interested to carry out projects that challenge the engineering society of oil and gas industry. Our capability spans all types of pipeline services such as basic design, detailed design and precommissioning.

DOWNLOAD ALL PROJECTS

1 Siri - Assalouyeh Offshore Pipeline Pre-commissioning

Project Title: Siri - Assalouyeh Offshore Pipeline Pre-commissioning

Company: IOEC

Year: 2010

Status: Completed

Description:

- (1 line × 289 km × 32")
• Dewatering
• Drying

2 Siri - Assalouyeh Onshore Pipeline Pre-commissioning

Project Title: Siri - Assalouyeh Onshore Pipeline Pre-commissioning

Company: IGC

Year: 2011

Status: Completed

Description:

- (1 line × 13 km × 32")
• Dewatering & Drying
• N2 Purging

3 Siri - Assalouyeh Offshore Pipeline Pre-commissioning and Inspection

Project Title: Siri - Assalouyeh Offshore Pipeline Pre-commissioning and Inspection

Company: IOEC

Year: 2011

Status: Completed

Description:

- (1 line × 289 km × 32")
• Cleaning
• Inline Inspection
• N2 Purging

4 South Pars Phase 13, Engineering

Project Title: South Pars Phase 13, Engineering

Company: Sadra

Year: 2011

Status: Completed

Description:

•          Detailed Design Verification in Collaboration with DeepSea (UK)

5 Hendiian Oil Field, Offshore Pipeline Pre-commissioning

Project Title: Hendiian Oil Field, Offshore Pipeline Pre-commissioning

Company: Attlas Offshore

Year: 2011

Status: Completed

Description:

- (2 lines × 6 km × 12")
• Hydro test

6 South Pars Phase 1, Offshore Pipeline Pre-commissioning

Project Title: South Pars Phase 1, Offshore Pipeline Pre-commissioning

Company: Ral Offshore

Year: 2011

Status: Completed

Description:

- (1 line × 5km × 18")
• Hydro test

7 Dorood D22 Wellhead Offshore Pipeline Engineering

Project Title: Dorood D22 Wellhead Offshore Pipeline Engineering

Company: Saff Rosemond

Year: 2012

Status: Completed

Description:

8 Mubarak/Salman Field Offshore Pipelines Leak Test/Purging

Project Title: Mubarak/Salman Field Offshore Pipelines Leak Test/Purging

Company: Ocean US/IOEC

Year: 2012

Status: Completed

Description:

- ( 200 m, 30”, 100 bar)
- (200 m, 6”, 167 bar)
- (26.3 km, 4”, 167 bar)
- (2.9 km, 14”, 14 bar)
- (8.7 km, 20”, 104 bar)

  • Leak Test
  • N2 purging

9 Reshadat Oil Field Offshore Pipelines

Project Title: Reshadat Oil Field Offshore Pipelines

Company: TASDID

Year: 2013

Status: Completed

Description:

3 lines: 16″ × 0.23 km to 5.3 km

2 line: 10″ × 56 km and 5.45 km

1 line: 8″ × 5.2 km

 

•  Dewatering

•  Drying

•  Nitrogen Purging

10 New Hengam Offshore Pipeline Engineering

Project Title: New Hengam Offshore Pipeline Engineering

Company: Ocean US

Year: 2013

Status: Completed

Description:

- (2 line × 3 km × 14")
- (2 line × 3 km × 4.5")

11 South Pars Phase 15 & 16, Offshore Pipeline Pre-commissioning

Project Title: South Pars Phase 15 & 16, Offshore Pipeline Pre-commissioning

Company: SGK / IOEC

Year: 2014

Status: Completed

Description:

- (1 lines × 120 km × 32")
• Dewatering
- (1 lines × 120 km × 4")
• Flooding

12 South Pars Phase 17 & 18, Onshore Pipeline Pre-commissioning

Project Title: South Pars Phase 17 & 18, Onshore Pipeline Pre-commissioning

Company: IOEC

Year: 2014

Status: Completed

Description:

- (2 lines × 4.5 km × 32")
- (2 lines × 4.5 km × 4")
• FCG & Hydrotest
• Dewatering & Drying
• Nitrogen Purging

13 South Pars Phase 19, Onshore Pipeline Pre-commissioning

Project Title: South Pars Phase 19, Onshore Pipeline Pre-commissioning

Company: Maroon Karan/IOEC

Year: 2014

Status: Completed

Description:

- (2 lines × 1.5 km × 32")
- (2 lines × 1.5 km × 4")
• FCG & Hydrotest
• Dewatering & Drying

14 South Pars Phase 12, Onshore Pipeline Pre-commissioning

Project Title: South Pars Phase 12, Onshore Pipeline Pre-commissioning

Company: IOEC/POGC

Year: 2014

Status: Completed

Description:

•          Dewatering & Flooding

•          Flushing & Hydrotest

15 South Pars Phase 17 & 18, Offshore Pipeline Pre-commissioning

Project Title: South Pars Phase 17 & 18, Offshore Pipeline Pre-commissioning

Company: IOEC

Year: 2014

Status: Completed

Description:

- (2 lines × 120 km × 32")
- (2 lines × 120 km × 4")

• FCG & Hydro test 
• Dewatering & Drying 
• N2 Purging

16 South Pars Phase 19, Offshore Pipeline Pre-commissioning

Project Title: South Pars Phase 19, Offshore Pipeline Pre-commissioning

Company: Ral Offshore/IOEC

Year: 2015

Status: Completed

Description:

- (2 lines × 110 km × 32")
- (2 lines × 110 km × 4")
• FCG & Hydrotest
• Dewatering & Drying
• N2 Purging

17 Hydrotest Operation for SPM Product Swivel of Phase 12

Project Title: Hydrotest Operation for SPM Product Swivel of Phase 12

Company: IOEC/POGC

Year: 2015

Status: Completed

Description:

18 South Pars Phase 22, Offshore Pipeline Pre-commissioning

Project Title: South Pars Phase 22, Offshore Pipeline Pre-commissioning

Company: Ral Offshore/IOEC

Year: 2015

Status: Completed

Description:

- (1 lines × 109 km × 32")
- (1 lines × 109 km × 4")
• FCG & Hydrotest
• Dewatering & Drying
• N2 Purging

19 South Pars Phase 18, Infield Pipeline Pre-commissioning

Project Title: South Pars Phase 18, Infield Pipeline Pre-commissioning

Company: SGK

Year: 2016

Status: In Progress

Description:

1 line: 18″ × 9 km

1 line: 4″ × 9 km

•   FCG & Hydrotest

•   Dewatering & Drying

•   N2 Purging

20 South Pars Phase 17, Infield Pipeline Pre-commissioning

Project Title: South Pars Phase 17, Infield Pipeline Pre-commissioning

Company: Ral Offshore

Year: 2017

Status: Completed

Description:

1 line: 20″ × 20 km

1 line: 4″ × 20 km

•   FCG & Hydrotest

•   Dewatering & N2 Purging

21 South Pars Phase 19, 4″ Offshore Pipeline Pre-commissioning

Project Title: South Pars Phase 19, 4″ Offshore Pipeline Pre-commissioning

Company: IOEC

Year: 2017

Status: Completed

Description:

1 line: 4″ × 110 km

•   FCG & Hydrotest

•   Dewatering

22 ISOLATION OF 32” & 18” PIPELINES AND REMOVAL OF BYPASS PIPING AT SPD 19C

Project Title: ISOLATION OF 32” & 18” PIPELINES AND REMOVAL OF BYPASS PIPING AT SPD 19C

Company: IOEC

Year: 2017

Status: Completed

Description:

•   Isolation & Degassing